Request a quoteLong lead times for transformers and switchgear can decide when a project energises. Here is how to secure a delivery date early and protect the programme.
Demand from data centres, grid connections and electrification has stretched lead times for power equipment. Industry reports in 2026 put new large transformers at several years in some markets, and switchgear has lengthened too.
If the transformer or the main switchboard arrives late, everything that depends on power waits: commissioning, the IT installation and the date your client moves in.
A factory can only reserve production once the ratings that decide the design are known. Agree with your supplier which details must be fixed to start and which can follow later.
A delivery date only means something when it is tracked. Ask for the milestones that lead to it and check them as they pass.
Plan the access route, lifting and storage before delivery, and protect the equipment until it is installed. Book the energisation with the network operator around a delivery date you trust, not one you hope for.